Frameworks & control

Control activities

Control activities are the measures that an organisation lays down in policies and procedures and carries out to reduce risks to its objectives as management has determined. In COSO Internal Control: Integrated Framework (2013) they form one of the five components of internal control, set out in principles 10 to 12. The term covers the individual measures, not the culture and structure in which they operate.

Source: COSO Internal Control: Integrated Framework (2013), principles 1 to 5 and 10 to 12; Dutch Corporate Governance Code 2025, best practice provisions 1.2.1, 1.2.3, 1.4.2 and 1.4.3; IIA Statement of Position Three Lines Model (2026); IIA Global Internal Audit Standards 2024 (Standard 13.2); Sarbanes-Oxley Act 2002, Section 404

COSO describes control activities as measures performed at all levels of the organisation, at various stages of business processes and over the technology environment. They may be preventive or detective and encompass manual and automated activities, such as authorisations and approvals, verifications, reconciliations and business performance reviews. The principles ask the organisation to select control activities that contribute to reducing risks to an acceptable level (principle 10), to establish general control activities over technology (principle 11) and to deploy them through policies that set out what is expected and procedures that put those policies into action (principle 12).

Under best practice provision 1.2.1 of the Dutch Corporate Governance Code 2025, the management board decides which measures are taken against the risks, and under provision 1.2.3 it assesses the design and operation of the systems at least once a year. In the management report it states which framework it applied (1.4.2 under ii); the explanatory notes give the COSO internal control framework as an example. The design and operation of control activities thus form part of the basis for the Statement on Risk Management (Verklaring omtrent Risicobeheersing, VOR) in provision 1.4.3, which applies to listed companies on a comply or explain basis. SOx 404 requires an assessment of internal control over financial reporting and applies only to SEC registrants.

Control activities differ from the control environment: integrity, board oversight, structures and authorities, competence and accountability (principles 1 to 5). A key control is a control activity that addresses a material risk, and a control framework records all measures in their coherence. Standard 13.2 of the Global Internal Audit Standards names four types an auditor may record in a risk and control matrix: preventive, detective, directive and corrective.

With Governance & Control Design, ONE Risk Advisory designs a lean control framework with the right, effective controls that matches the organisation's actual risks.

Last updated: · Editor: ONE Risk Advisory

Related service Governance & Control Design

Frequently asked questions

What is the difference between control activities and the control environment?

The control environment covers integrity, board oversight, structures and authorities, competence and accountability (COSO principles 1 to 5). Control activities are the concrete measures against specific risks (principles 10 to 12). COSO requires all components to operate together as an integrated system: well designed control activities do not make up for a deficient control environment.

Who is responsible for control activities?

Management in the first line designs, implements and operates the controls, according to the IIA's Statement of Position on the Three Lines Model (July 2026). At listed companies, the Dutch Corporate Governance Code 2025 makes the management board responsible for managing the risks and for assessing design and operation every year; the supervisory board oversees and internal audit provides independent assurance.